• State Plaza Building, The Hive Offices, Plot 185, City Center, 2nd District, New Cairo, Cairo, Egypt

    +20 (2) 2811 0510

  • Fax

    +20 (2) 2811 0509

  • Phone

    ClampOn at EGYPS 2018

    February 20th, 2018 Posted by Press 0 thoughts on “ClampOn at EGYPS 2018”

    Given the success of last year, ClampOn decided to exhibit in EGYPS 2018. At the stand some of ClampOn products were displayed including, Particle Monitor, Pig Detector and Corrosion-Erosion Monitor.

    Baard Bratteboe and Eirik Walle along with the team from Obelisk were there at the stand assisting the visitors with their inquiries and showing them live demos of the equipment.

    1st ClampOn Technology Day in Egypt

    October 24th, 2017 Posted by Press 0 thoughts on “1st ClampOn Technology Day in Egypt”

    On the 17th of October, OPS and ClampOn hosted the first Technology Day in Egypt at the JW Marriott.

    The event covered a wide range of topics of interest to Operations, Projects, Reservoir and Drilling professionals. Topics included sand management, corrosion and erosion monitoring, vibration monitoring and well collision detection. The event included a series of presentations by three of ClampOn experts as well as live demos on actual ClampOn devices.
    More than 30 professionals from the major international and joint operators in Egypt including BP, PhPC, Shell, Rashpetco, Eni, Petrobel, PICO, Gemsa, Khalda, Agiba and TransGlobe as well as from EPCs, Engineering companies and service providers including PMS, Intecsea and OGS have actively participated in the event.

    Following the event a series of meetings in Cairo and Alex were held with some of the main operators who were interested in discussing speicific applications of the ClampOn technologies to their operations.

    ClampOn Annual Technology Day

    September 16th, 2017 Posted by Press 0 thoughts on “ClampOn Annual Technology Day”

    ClampOn – the world’s leading ultrasonic intelligent sensors’ manufacturer – is holding its first Technology Day in Egypt on the 16th of October 2017 at the JW Marriott hotel.

    This is an event which ClampOn traditionally holds annually, previously between Europe and North America. This year it shall be held in Cairo, in recognition of the growth of the Egyptian Oil and Gas market. The event familiarizes our clients with the operation of the ultrasonic range of equipment (both topside and subsea) along with its various utilizations. This is achieved through a set of presentations by ClampOn’s technical experts and demonstrations of the actual equipment.

    Obelisk Signs Agreement With Oman Drilling Solutions

    September 16th, 2017 Posted by Press 0 thoughts on “Obelisk Signs Agreement With Oman Drilling Solutions”

    Obelisk has recently signed agreement with Oman Drilling Solutions, becoming their representative In Egypt. This marks an important milestone for Obelisk as we take our local knowledge of the market and experience into the drilling sector. For more info on Oman Drilling Systems, please visit http://modus.global/

    PetroJet Progressing the Site Installation of Banha-Menouf Bridges

    September 1st, 2017 Posted by Press 0 thoughts on “PetroJet Progressing the Site Installation of Banha-Menouf Bridges”

    Petrojet progressing the site installation of Banha-Menouf bridges after OsmaCom deliver’s its sub-contracted 500-tonnes of steel built-up sections on-time. This is part of Petrojet’s role in a number of civil projects helping improve Egypt’s infrastructure

    OsmaCom Successfully Delivers Petrojet’s First Project Awarded Via Obelisk Petroleum Services

    April 7th, 2017 Posted by Press 0 thoughts on “OsmaCom Successfully Delivers Petrojet’s First Project Awarded Via Obelisk Petroleum Services”

    In March 2017 OsmaCom has successfully delivered to Petrojet its first project awarded via Obelisk Petroleum Services, the steel structures of the bridge of Banha/Menouf. This fast-track project is part of Egypt’s national highway upgrade program. The project was completed in only three months to meet Petorjet’s challenging schedule to the satisfaction of Petorjet and its client –General Authority For Roads, Bridges & Land Transport (GARBLT).

    This marks the beginning of a long-term cooperation between OsmaCom, Obelisk Petroleum Services and Petrojet which aims at supporting Petrojet in delivering its challenging projects over the short and medium terms.

    Obelisk Establishing Long Term Partnership with PetroJet

    November 1st, 2016 Posted by Press 0 thoughts on “Obelisk Establishing Long Term Partnership with PetroJet”

    Obelisk is currently progressing with the establishment of a long term partnership with Egypt’s biggest Oil & Gas construction company – PetroJet.

    This will include both civil and Oil & Gas related projects.

    ADIPEC 2016

    February 24th, 2016 Posted by Press 0 thoughts on “ADIPEC 2016”

    Obelisk is set to travel to Abu Dhabi to attend one of the biggest Oil and Gas exhibitions – ADIPEC 2016.

    See you there!

    © 2016 Obelisk Petroleum Services. All Rights Reserved.

    RMMD-Website-Logo-Small-White